Unlimited Elements Error: Error in widget WordPress Menu, You have some other plugin that loaded another version of twig. It's uncompatable with unlimited elements unfortunatelly.
  • Threads for stitching footwear
  • Very efficient material movement and production facility for raw material entry to finished goods warehousing and despatch is a PEB structure.
  • Production facility completed with a PCC 2 storied building having the Office, R & D, Quality control.
  • Design of all infrastructures and utilities including the Zero Liquid Discharge system.
  • Complex design of multiple utilities.
  • Boiler for Steam generation.
  • RCC mezzanine structure to allow for complex movement of raw material and services.
  • Independent dining block, creche etc..
CLIENT
AMANN
Location
Ranipet, Tamil Nadu
Status
Completed
Site Area
8 Acres
Built Up Area
1,26,000 Sqft
year
2024