Unlimited Elements Error: Error in widget WordPress Menu, You have some other plugin that loaded another version of twig. It's uncompatable with unlimited elements unfortunatelly.
  • Industrial Development Master Plan
  • The master plan is developed by CDC Development India Pvt. Ltd.
  • The layout features 21 well-demarcated industrial plots, designed to cater to a variety of industries including manufacturing, warehousing, logistics, and ancillary services.
  • Plot sizes vary from 1.67 acres to 10.09 acres, offering flexibility for small, medium, and large-scale industrial setups.
  • Equipped with essential infrastructure including power, water supply, drainage systems, a well-laid internal road network, street lighting, signage, and efficient stormwater and waste management systems.
  • Each plot is directly accessible through a 30-meter-wide arterial road running east to west.
CLIENT
CDCI
Location
Bengaluru, Karnataka
Status
On going
Site Area
70.1 Acres
year
2025